The TDAC water maintenance team will be in action at Kelsall Pool on the 8th of May assembling at 9.30am. There are quite a few jobs to be carried out. They are the main entrance gate which needs new posts and the gate hanging. All of the pegs need attention as do the two stages.
Andy Lenihan has already strimmed the walkways in preparation for the work party.
If you are interested in helping out, just turn up on the day, a spade is always useful.
Thanks in advance.
Bryan perks
