These have been arranged as follows;
Willow and Lodge Pools – Saturday 8th April 2017.
Construction of 6 Fish Refuges and relaying of the 2 Concrete Slabs on 6 Pegs which form the Fishing Platforms, removal of at least 4 fallen trees on Willow Pool and removal of the Ropes which have acted as a Cormorant deterrent on both Willow and Lodge Pool
Cotebrook Mill Pool – Saturday 22nd April 2017.
Main work will be to repair the collapsed bank at the back of Peg 11. Installation of Gates to replace the Stiles in the 2 Fences on the left hand side of the Pool and to replace Peg 11 and possibly construct a 2nd Bivvy Peg at water level where Peg 11 is now, if time and personnel permit. (We have arranged for at least 1 Mini Digger to be present to assist with this work)
Please if you can, come and help us to carry out this essential maintenance work.
